NZ Forest Managers Bridge

Project Description

The NZFM Bridge project involved designing a new access bridge to take logging trucks into the Rotoaira Forest.

Specs:
  • Bridge Type: Steel Beams with Precast Concrete Deck Panels
  • Total Length: 30m
  • Number of Spans: 3
  • Abutment Type: Piled Steel Columns and Precast Concrete Headwall
  • Pier Type: Piled Steel and Steel Frame
  • Load Rating: HN-H0-72
Project Details
  • Categories:
    Bridges