NZ Forest Managers Bridge
Project Description
The NZFM Bridge project involved designing a new access bridge to take logging trucks into the Rotoaira Forest.
Specs:
- Bridge Type: Steel Beams with Precast Concrete Deck Panels
- Total Length: 30m
- Number of Spans: 3
- Abutment Type: Piled Steel Columns and Precast Concrete Headwall
- Pier Type: Piled Steel and Steel Frame
- Load Rating: HN-H0-72
Project Details
-
Categories:
Bridges