Stewart Bridge

Project Description

The Stewart Bridge project involved designing a replacement bridge for stock, pedestrians and vehicles after the existing bridge was washed away.

Specs:
  • Bridge Type: Steel Beam with Precast Concrete Deck Panels
  • Total Length: 72m
  • Number of Spans: 2
  • Abutment Type: Piled Steel Columns and Precast Concrete Headwall
  • Pier Type: Reinforced Concrete Cylinder
  • Load Rating: 5kPa Uniformly Distributed/Class 1
Project Details
  • Categories:
    Bridges