Stewart Bridge
Project Description
The Stewart Bridge project involved designing a replacement bridge for stock, pedestrians and vehicles after the existing bridge was washed away.
Specs:
- Bridge Type: Steel Beam with Precast Concrete Deck Panels
- Total Length: 72m
- Number of Spans: 2
- Abutment Type: Piled Steel Columns and Precast Concrete Headwall
- Pier Type: Reinforced Concrete Cylinder
- Load Rating: 5kPa Uniformly Distributed/Class 1
Project Details
-
Categories:
Bridges