New Plymouth Water Supply

Project Description

The New Plymouth Water Supply Suspension Bridge project involved designing three new bridges over several rivers.

Specs: Bridge over Mangorei River
  • Bridge Type:  Suspension Bridge with Precast Concrete Deck Beams
  • Total Length: 75m
  • Number of Spans: 3
  • Abutment Type: Piled Steel Columns and Precast Concrete Headwall
  • Tower Type: Reinforced Concrete
  • Pier Type: Steel Pile
  • Load Rating: Pedestrian
Specs: Bridge over Te Henui River
  • Bridge Type: Suspension Bridge with Precast Concrete Deck Beams
  • Total Length: 60m
  • Number of Spans: 3
  • Abutment Type: Piled Steel Columns and Precast Concrete Headwall
  • Tower Type: Reinforced Concrete
  • Pier Type: Steel Pile
  • Load Rating: Class 1
Specs: Bridge over Waiwhakaiho River
  • Bridge Type: Suspension Bridge with Precast Concrete Deck Beams
  • Total Length: 75m
  • Number of Spans: 3
  • Abutment Type: Piled Steel Columns and Precast Concrete Headwall
  • Tower Type: Reinforced Concrete
  • Pier Type: Steel Pile
  • Load Rating: Pedestrian
Project Details
  • Categories:
    Bridges